Company News | Save More, Earn More! Shanggong Machinery's MS Series All-Electric Double-Wheel Mixing: The Top Choice for Energy-Saving and Consumption-Reducing Construction!

2025-05-14 4283 0人评论

As new infrastructure construction continues to accelerate

underground foundationscutoff wallsconstruction continues to ramp up

"dual-wheel mixing" has gradually become a hot term


Recently, good news came from the Wuhan area

Shangong Machinery's MS series all-electric dual-wheel mixing drilling rig

at the expansion project of the Houhu campus of Wuhan Central Hospital

with outstanding energy saving and consumption reduction, delivered a standout performance

     

Based on the local policy requirements of the Wuhan area and the particular nature of the geological operations, the customer placed higher demands on the environmental performance and energy utilization efficiency of the construction equipment.

Shangong Machinery's MS series dual-wheel mixing drilling rig adoptsvariable-frequency speed-regulated motorswith direct drive replacing the traditional hydraulic transmission system, making it more energy-efficient and stable; at the same time, it uses forced motor cooling technology, achieving high construction efficiency and lower operating costs.After rigorous equipment evaluation and operationalcomparison, the project team ultimately firmly chose this Shangong Machinery equipment."Efficient construction, energy-saving and reliable!Exactly what the project needs!" Today, this equipmentwith its excellent construction performance,provides strong construction support for the project.

▲ Project site
Real-world practice is the best arena. In the expansion project of the Houhu campus of Wuhan Central Hospital, the works involve underground equal-thickness cement-soil mixing water-stopdiaphragm wallsof 9,000 cubic meters, with a depth of 50 m, a wall thickness of 800 mm, and a cement admixture content of 25%. The construction difficulty lay in the large gravel layers and silty clay layers discovered underground during the process, with the strata alternating between soft and hard. Since construction began, the equipment has been reliable in quality and has always been in full attendance, running nonstop with people while the machine keeps working, fully meeting the construction demand for highly efficient attendance, and carrying out construction at an efficiency of 3 wall panels per 24 hours. Its construction efficiency far exceeds that of comparable products in the industry, earning high praise from the contractor.

图片

▲ Equipment working site
Shangong Machinery's MS series dual-wheel mixing drilling rig adopts variable-frequency speed-regulated motor direct drive to replace the traditional hydraulic transmission system, delivering powerful performance while being energy-saving and efficient. According to on-site measurement data, one underground equal-thickness cement-soil water-stop mixing wall with a depth of 50 m takes 8 hours,and its energy consumption can save 40% electricity compared with the transmission system of traditional dual-wheel mixing drilling rigs,greatly saving operating costs.

图片

▲ Equipment working site
The equipment adopts an intelligent control system that can presetmilling heads, hydraulic drills, air compressors, mixing head inclination angles and other control parameters and construction parameters and monitor them. It can collect and monitor verticality and slurry flow rate, and store data, ensuring wall quality.


▲ Equipment working site

For key domestic projects, with supporting professional construction equipment, Shangong Machinery will continue to develop products down to earth, overcome technical barriers, provide wholehearted service, persist in going deep into the front lines of the market, closely align with customer needs, and continuously carry out technological innovation. Taking advantage of the industry's prosperity, we will seek development together with everyone!


评论 (0)

TOP