At the construction site of the Huatanzi Reservoir, a national water conservancy project in Sinan County, Guizhou, machines roar and the scene is bustling. Two HZS240 containerized hydraulic concrete batching plants from Fangyuan Group have been installed here and successfully commissioned, providing solid guarantees for the smooth progress of the project and becoming an indispensable and powerful support for the entire project.
The Huatanzi Reservoir project is a major water conservancy project listed in important documents and plans such as the Opinions of the State Council on Supporting Guizhou in Breaking New Ground in the Large-Scale Development of the Western Region in the New Era, the 14th Five-Year Plan for Water Security, and the 14th Five-Year Plan for Water Conservancy Development of Guizhou Province. The dam site is located in Sinan County, on the lower reaches of the Qingdu River, a first-level tributary of the Wu River. The project is of large (2) scale, with an annual water supply of 89.09 million cubic meters, an estimated total investment of 3.217 billion yuan, and a construction period of 45 months. The project focuses on urban and rural water supply and irrigation, while also incorporating power generation. Once completed, it will effectively solve the domestic water supply problem for 337,300 people in the central urban area of Sinan County and surrounding rural areas, as well as the production water supply problem for the provincial-level industrial park of Sinan County, Tangtou Bazi and other contiguous irrigation areas totaling 50,100 mu. It will play an important role in promoting the security of urban and rural water supply in key areas of underdeveloped regions, improving irrigation water supply conditions for contiguous farmland in rocky desertification mountainous areas, and helping the water-receiving areas consolidate and expand the achievements of poverty alleviation, comprehensively advance rural revitalization, and achieve high-quality regional economic and social development.

In such a grand and significant project, the supply of concrete is crucial. With its outstanding performance, Fangyuan Group's dual-unit HZS240 hydraulic concrete batching plant has become the ideal choice for the construction of the Huatanzi Reservoir. This batching plant adopts advanced technology and design concepts and has multiple advantages such as high efficiency, stability, and environmental protection. In terms of efficient production, the dual-unit configuration enables a theoretical capacity of 480 cubic meters per hour, greatly meeting the enormous demand for concrete in the construction of the Huatanzi Reservoir. Whether for large-scale infrastructure construction or the pouring of various hydraulic structures, it can provide high-quality concrete in a timely and sufficient manner.
In terms of stability, Fangyuan batching plants use high-quality raw materials and advanced manufacturing processes, and all key components undergo strict quality inspection to ensure stable operation of the equipment under long-term, high-intensity working conditions. This is crucial for a project like the Huatanzi Reservoir with a long construction period and heavy tasks, effectively guaranteeing the smooth progress of the project.

It is worth mentioning that Fangyuan batching plants perform excellently in environmental protection. In terms of dust treatment, they are equipped with efficient dust removal systems and, through methods such as head-cover dust removal, strictly control the escape of sand and gravel dust, reducing the impact on the surrounding environment and the health of construction personnel. In terms of wastewater treatment, the batching plant has a complete wastewater recovery and utilization system, so that wastewater generated during production undergoes sedimentation, filtration, purification, and other treatments to achieve cyclic utilization of water resources, meeting environmental protection requirements and helping the Huatanzi Reservoir build a green project.
At present, the construction of the Huatanzi Reservoir is progressing steadily. The main mixing unit of Phase I of the Fangyuan batching plant has successfully produced high-quality concrete, and the belt conveyor equipment for the Phase II sand and gravel storage yard has been put in place and successfully installed and commissioned. In the future construction process, the Fangyuan dual-unit HZS240 hydraulic concrete batching plant will continue to leverage its advantages, contribute to the early completion of the Huatanzi Reservoir, and witness the rise of this major water conservancy project on the land of Guizhou, benefiting the local people.
14th Forum - Speaker | Xu Hongquan: Research on Deep-Water Foundation Design for High-Speed Railway Sea-Crossing Bridges
下一篇'Boda' Launches: CREG Helps Accelerate Construction at Guizhou Gaoyuan Coal Industry!

2026-09-28 1137 0

2026-09-24 10491 0

2026-09-23 10629 0

2026-09-22 10708 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)