
ARA Show 2025
As North America's largest annual rental trade show, ARA Show 2025 officially opened on January 28, where Genie presented its latest products. The all-new 26-meter electric & hybrid boom lift made its official global debut; the new-generation electric scissor lift was showcased; and two forklifts with fully upgraded performance and design made a brilliant appearance. Each piece of equipment is built for different work scenarios, bringing rental customers lower total cost of ownership and maximum return on investment.

Genie Makes a Brilliant Appearance at the 2025 ARA Show in the US
A Perfect Combination of Super-High Capacity and Electric Drive Technology
All-New Hybrid Straight Boom Aerial Work Platform

Technical Specifications of the All-New Hybrid Straight Boom Aerial Work Platform S-85 XC FE

All-New Hybrid Straight Boom Aerial Work Platform S-85 XC FE
The Choice That Maxes Out Both Looks and Performance
All-New Generation Genie Electric Scissor Lift

Technical Specifications of the All-New Generation Genie Electric Scissor Lift GS-1932

All-New Generation Genie Electric Scissor Lift GS-1932
High Efficiency, Multi-Function
All-New Genie Telehandler

Technical Specifications of the All-New Genie Telehandler GTH-1244

Technical Specifications of the All-New Genie Telehandler GTH-1244
Combining Convenience and Versatility
Genie Super HoistGenie Super Material Lift

Technical Specifications of the Genie Super Material Lift SLA-20
Lightweight, Durable, Flexible
Mast Climbing Aerial Work Platform

Technical Specifications of the Mast Climbing Aerial Work Platform GR-20
Opening a New Model for Training
Immersive VR Experience

All-New Genie VR Training Platform

Genie Booth at the ARA Show

Can-Am Commander 700 XT All-Terrain Vehicle
Confirmed! China-Kyrgyzstan-Uzbekistan Transnational Railway to Officially Break Ground in the Second Half of 2025
下一篇New Prospects in the Year of the Snake · Embarking on a New Journey | Rushing Orders, Busy Production: CRCHI Sounds the "Assembly Call" for the Spring Start of Work

2026-09-28 1137 0

2026-09-24 10491 0

2026-09-23 10629 0

2026-09-22 10708 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)