
Recently, the acceptance work for the three-year maintenance project of hundred-ton-class transport equipment for Guoneng Beidian Shengli Energy Co., Ltd., undertaken by Northern股份 Company, was successfully completed, delivering a perfect result for this project.
Over the past three years, the company's project team stationed at Guoneng Beidian has endured severe cold and scorching heat, always staying on the front line of equipment maintenance, ensuring the stable operation of every piece of equipment with professionalism and sweat, and has received high praise from the customer in aspects such as maintenance quality, troubleshooting technology, and on-site safety management.
In terms of maintenance quality, from meticulous daily upkeep to in-depth comprehensive periodic maintenance, every step strictly follows standard operating procedures. As a result, the equipment failure rate has been significantly reduced and operational stability greatly improved, providing solid and reliable support for the customer's production and operations and earning the customer's recognition and trust in our maintenance quality.
In terms of troubleshooting technology, project team members have forged strong core competitiveness with superb professional capabilities and rich practical experience. Facing various "difficult and complicated problems" arising during equipment operation, they are all readily resolved by the project team members. They have demonstrated with their strength what efficient professionalism means, freeing the customer from worry and anxiety when facing sudden equipment failures.
In terms of on-site safety management, safety maintenance has always been the top priority in maintenance service work. Strict safety training enables everyone to thoroughly master every safety operating procedure; continuous on-site supervision and inspection promptly identify and correct any potential safety hazards. Over these three years, the company's project team successfully achieved the outstanding goal of zero accidents at maintenance work sites, providing the customer with a safe and reliable maintenance service environment and setting a model of on-site safety management for the entire industry.
In the future, based on the rich experience accumulated over the past three years, the company's project team will continue to improve its maintenance service level in new projects, continue to uphold professionalism, hold itself to higher standards, provide customers with more outstanding equipment inspection and maintenance services, continuously consolidate and enhance the company's reputation and position in the industry, and forge ahead courageously toward higher goals.
'Technology Engine' Drives Major Water Conservancy Project Construction: Haihe Tide Gate Risk Elimination and Reinforcement Project Yields Technological Achievements
下一篇North China Electric Power University Attends and Speaks at the Second Dean's Conference of Excellent Engineer Schools and the Symposium on Excellent Engineer Training Certification Standards

2026-09-28 1157 0

2026-09-24 10586 0

2026-09-23 10714 0

2026-09-22 10808 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)