Taizhou Yongning River Science and Innovation City Project (Re-tender)
I. Industry: Municipal Engineering
II. Tenderee: Taizhou Huangyan Economic Development Group Co., Ltd.
III. Total Project Investment: RMB 7,608,230,000.00
IV. Project Overview: The project scope extends north to Wanglinyang Island, south to Dongpu Road, west to the Yongning River waterfront, and east to the Jintai Railway, with a total area of approximately 525.21 hectares. The Economic Development Group intends to adopt an "integrated regional investment, construction, and operation" approach and select a partner for joint development. The cooperation includes: 1. Overall project development planning and services; 2. Investment in land development and consolidation for the project; 3. Investment and construction of infrastructure and public service facilities; 4. Investment and construction of residential projects; 5. Smart city development and urban operations, etc.
This project adopts a cooperative development model, whereby the tenderee introduces experienced and capable social capital through public bidding; the winning bidder and Taizhou Huangyan Economic Development Group Co., Ltd. or its subsidiary shall jointly contribute capital to establish a project company in Huangyan District, Taizhou City, with shareholding ratios of 90% and 10% respectively. The registered capital of the project company is tentatively set at RMB 100 million.
V. Lot Division: /
VI. Planned Construction Period: The cooperation period of this project is 17 years, including a construction period of 7 years and an operation period of 10 years.
VII. Obtaining of Bidding Documents:
Time for obtaining bidding documents: 2024-07-03 to 2024-07-23; Method: Online download
Announcement Release Date: 2024-07-03
Deadline for Submission of Documents: 2024-07-24
Place for Submission of Bidding Documents: Upload via system
Source: Zhejiang Provincial Public Resource Trading Service Platform
Link:
https://ggzy.zj.gov.cn//jyxxgk/002001/002001001/20240703/7045bcc7-703c-44c7-a7cd-046863543162.html
Zhongyao Village Shantytown Renovation Project (Phase III) Resettlement Housing Construction Project - Lot 2 Construction Bidding Announcement
I. Industry: Construction Engineering
II. Tenderee: Luoyang Chanhe Urban Renewal Project Consortium Engineering General Contracting Department of China Railway Construction Investment Group Co., Ltd.
III. Total Project Investment: Approximately RMB 7.127 billion
IV. Project Overview: On February 10, 2021, a consortium led by China Railway Construction Investment Group Co., Ltd. won the bid for the Luoyang Chanhe Hui District Old City Renovation (Urban Renewal) Project. The project is located in Chanhe District, Luoyang City, and its scope includes the construction of two resettlement housing projects—Xusheng Village Phase V and Zhongyao Village (Phase III)—as well as the requisition, demolition, and public bidding/auction/listing work for seven plots including the southern plot of the 4S store and the central plot of the Confucius Entering Zhou Asking about Rites site. The total land area of the project is approximately 1,816.21 mu, with a total investment of approximately RMB 7.127 billion. The project cooperation period is tentatively set at 4.5 years. This tender covers the construction of some buildings and supporting facilities of the Zhongyao Village Shantytown Renovation Project (Phase III) Resettlement Housing Construction Project.
V. Lot Division: 1 lot
VI. Planned Construction Period: Tentatively 4.5 years
VII. Obtaining of Bidding Documents:
All interested bidders are requested to, between July 5 and July 9, 2024, from 9:00 to 11:30 a.m. and from 15:00 to 17:00 p.m. (Beijing time, the same below), bring a color copy of the business license affixed with the company seal, a color copy of the qualification certificate, a color copy of the safety license, a letter of introduction from the unit (original), and the handler's ID card (original and copy) to Room 1707, Unit 2, Building 50, Junhewan Residential Community, Chanhe Hui District, Luoyang City, to obtain the bidding documents.
Announcement Release Date: 2024-07-04
Deadline for Submission of Documents: 9:30 on July 16, 2024
Place for Submission of Bidding Documents: Room 1711, Unit 2, Building 50, Junhewan Residential Community, No. 555 Jiamaying Road, Chanhe Hui District, Luoyang City
Source: Website of China Railway Construction Investment Group Co., Ltd.
Link:
https://www.crccig.com/art/2024/7/4/art_6152_4921187.html
Second Pre-qualification Announcement for Franchisee of the Chenzhuang to Feicun Section Project of the Datong Ring Expressway
I. Industry: Highway Engineering
II. Tenderee: Datong Highway Development Center
III. Total Project Investment: RMB 2,443,835,400. Of this, construction investment is RMB 2,332,288,600, and construction-period interest is RMB 111,546,800. Project investment and financing structure: ① The project capital is 20% of the total investment, i.e., RMB 488,767,100. Of this, the government side contributes RMB 10,000,000 from municipal-level fiscal funds (accounting for 2.05% of the contribution), and the franchisee contributes RMB 478,767,100 (accounting for 97.95% of equity). ② The remaining funding gap of RMB 1,955,068,300 shall be raised and resolved by the project company/franchisee.
IV. Project Overview: This project is located in Yunzhou District and Yungang District, Datong City, Shanxi Province. The starting point is located east of Chenzhuang Village, Yunzhou District, and the endpoint is located northeast of Feicun Village, Yungang District, with a total length of 22.339 km. The project adopts the standard of a two-way four-lane expressway, with a design speed of 100 km/h and a subgrade width of 26.0 m. The construction scope of this project includes sub-projects and other works such as subgrade and pavement, bridges and culverts, passages, traffic engineering and roadside facilities, greening and environmental protection, etc., and the project company shall be responsible for investment and construction.
V. Lot Division: 1 lot
VI. Planned Construction Period: /
VII. Obtaining of Bidding Documents:
Obtaining time: 2024-7-4 10:00 -- 2024-7-9 10:00
Obtaining method: Log in to the Jinchan Electronic Trading Platform to apply online and download the pre-qualification documents (http://ty2.jcebid.com/).
Announcement Release Date: 2024-07-04
Deadline for Submission of Documents: 2024-07-16 09:00:00
Place for Submission of Bidding Documents: Jinchan Electronic Bidding and Tendering Comprehensive Trading Platform (http://ty2.jcebid.com/)
Source: Jinchan Electronic Bidding and Tendering Comprehensive Trading Platform
Link:
https://www.jcebid.com/announcement/view/668603cc9a6f07142ef6c4de
Public Bidding Information Sheet for the Fengxian New City Unit 21 E11A-05 Regional Plot Project
I. Industry: Construction Engineering
II. Tenderee: Shanghai Xiecheng Construction and Development Co., Ltd.
III. Total Project Investment: RMB 1,695,170,000
IV. Project Overview: Construction location: Nanqiao Town, Fengxian District (boundaries: east to Ziyao Road; west to Xiaonan Road green space; south to Xingning Road; north to Zhangwengmiao River green space)
Project overview description: Fengxian New City Unit 21 E11A-05 residential buildings, with a land area of 20,130 square meters. The building types are multi-story and high-rise buildings, with a proposed total construction area of 78,447 square meters, of which the above-ground construction area is 51,085 square meters and the underground area is 27,362 square meters.
V. Lot Division: /
VI. Planned Construction Period: Design period: 65 calendar days. Construction period: 1,278 calendar days.
VII. Obtaining of Bidding Documents:
Method for obtaining bidding documents: Download the bidding documents through the electronic bidding and tendering trading platform of the Shanghai Construction Engineering Trading Service Center (website: www.shcpe.cn).
Time for obtaining bidding documents: 00:00 on July 3, 2024 to 00:00 on July 8, 2024 (excluding statutory holidays of 3 days or more)
Announcement Release Date: 2024-07-03
Deadline for Submission of Documents: 14:00 on July 24, 2024
Place for Submission of Bidding Documents: Meeting Room C323, Bidding Office, 3rd Floor, Building C, Lane 1529 Wangyuan South Road, Nanqiao Town, Fengxian District, Shanghai
Source: Website of Shanghai Construction Engineering Trading Service Center
Link:
https://ciac.zjw.sh.gov.cn/XMJYPTInterWeb/Gktb/GktbIndex?gkzbXh=200352
Shenzhen-Zhongshan Link, in Which Shanghai Yuanyang Participated in Construction, Officially Opens to Traffic, with First-Day Traffic Exceeding 125,000 Vehicles!
下一篇Sunward's 'Technological Innovation and Utilization of Large-Diameter Deep-Hole Integrated Drilling and Protection with Concentric Casing While Drilling' Project Approved as a Key R&D Program Project of Hunan Province

2024-10-08 13423 0

2024-09-30 13142 0

2024-09-20 12919 0

2024-09-13 13091 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)