Effortless Precision, Masterful Performance | Jintai SD40 Large Rotary Drilling Rigs Support Qingdao Metro Construction

2024-06-21 2687 0人评论

Recently, two Jintai rotary drilling rigs have been working on construction at the Sifang Factory Station of Qingdao Metro Line 5.

微信图片_20240620144739.jpg

The project is located in the existing open space on the northeast side of the Jiaoji Railway. To the north is Plot 100# of CRRC Smart Port, planned for 14- to 25-story residential buildings with one basement level; to the south is the Jiaoji Railway; and to the north of the entrance/exit is the planned Siji South Road.

Project Overview

The open-cut section of Entrance/Exit A2 at Sifang Factory Station has a total length of approximately 145.2 m, an excavation width of 8 m to 11.4 m, and a pit depth of approximately 23.8 m to 26.35 m.

At this site, 0 to 2 meters is backfill soil, 2 to 7 meters is moderately weathered sandstone, and 13 to 30 meters is slightly weathered sandstone.

微信图片_20240620144754.jpg

The equipment participating in this construction consists of Jintai medium and large rotary drilling rigs, both of which are customized low-profile versions. Although their height has been reduced, their rock-drilling capability has not been compromised at all. With a hole depth of 30 m, a speed of one pile in 9 hours has been recognized by the user. Effortlessly handling heavy tasks with ease, they have once again demonstrated Jintai rotary drilling rigs' rock-drilling capability to the market.

评论 (0)

TOP