2.6 Billion: Beijing Major Project Bidding

2024-03-11 2625 0人评论
National Highway 234 (Yongning-Liulimiao) Road Project (Huairou Section) Civil Engineering Construction Bidding Announcement

  I. Industry: Highway
  II. Tenderee: Huairou Highway Branch, Beijing Municipal Commission of Transport
  III. Total Project Investment: 2,600 million RMB
  IV. Project Overview:
  2.1 Project Scale: The project is located in Huairou District and Yanqing District of Beijing, starting from Yongning Town in Yanqing District in the west and ending at Liulimiao Town in Huairou District in the east. The National Highway 234 (Yongning-Liulimiao) section starts from the west side of Yongning Town and ends at National Highway 111, with a total length of 59 kilometers, including about 38.4 kilometers in Yanqing section and about 20.6 kilometers in Huairou section. The road grade is Class I highway.
  2.2 Bidding Content and Scope: This bidding project is divided into 4 sections, and this bidding is for the following:
National Highway 234 (Yongning-Liulimiao) Road Project (Huairou Section) Civil Engineering Section 1
  This section starts at chainage YK38+373.9 and ends at chainage YK43+656.0, with a length of 5282.1 meters. Bidding scope: construction of all contents shown in the drawings, including road engineering, bridge engineering, culvert engineering, tunnel engineering, landscaping engineering, etc.
  Construction location: Huairou District, Beijing
  Estimated contract price: 651,402,748 RMB
  Planned construction period: 944 calendar days
National Highway 234 (Yongning-Liulimiao) Road Project (Huairou Section) Civil Engineering Section 2
  This section starts at chainage YK43+656.0 and ends at chainage YK48+908.0, with a length of 5252.0 meters. Bidding scope: construction of all contents shown in the drawings, including road engineering, bridge engineering, culvert engineering, tunnel engineering, landscaping engineering, etc.
  Construction location: Huairou District, Beijing
  Estimated contract price: 700,688,515 RMB
  Planned construction period: 944 calendar days
National Highway 234 (Yongning-Liulimiao) Road Project (Huairou Section) Civil Engineering Section 3
  This section starts at chainage YK48+908.0 and ends at chainage YK53+330.0, with a length of 4422.0 meters. Bidding scope: construction of all contents shown in the drawings, including road engineering, bridge engineering, culvert engineering, tunnel engineering, landscaping engineering, etc.
  Construction location: Huairou District, Beijing
  Estimated contract price: 698,702,585 RMB
  Planned construction period: 944 calendar days
National Highway 234 (Yongning-Liulimiao) Road Project (Huairou Section) Civil Engineering Section 4
  This section starts at chainage YK53+330.0 and ends at chainage YK59+000.0, with a length of 5670.0 meters. Bidding scope: construction of all contents shown in the drawings, including road engineering, bridge engineering, culvert engineering, tunnel engineering, landscaping engineering, etc.
Construction location: Huairou District, Beijing
  Estimated contract price: 888,090,367 RMB
  V. Section Division: 4
  VI. Planned Construction Period: 944 calendar days
  VII. Obtaining Bidding Documents: Bidders shall use CA digital certificates to log in to the Beijing Public Resources Comprehensive Trading System (website: https://www.bjggzyzhjy.cn/zhjy/, hereinafter referred to as the "Electronic Trading Platform"), specify the section to bid for, and download the bidding documents, bill of quantities, and drawings. For consortium bidding, all consortium member information must be filled in and confirmed by all members using CA digital certificates, and then the consortium leader shall complete the download of bidding documents and other materials.
  Announcement release date: March 7, 2024
  Deadline for submission: 9:30 AM, April 3, 2024
  Place for submission of bidding documents: Bidders shall, before the bidding deadline, use CA digital certificates to log in to the "Electronic Trading Platform", upload the encrypted bidding documents, and save the electronic receipt voucher automatically generated by the system after successful upload. The submission time shall be the time on the electronic receipt voucher. The "Electronic Trading Platform" will reject bidding documents not encrypted as required or not uploaded successfully before the deadline. Beijing Public Resources Comprehensive Trading System (website: https://zhjy.bcactc.com/zhjy/)