ZDM55 Dual-Wheel Milling & Mixing Drilling Rig

Zhenzhong Machinery ZDM55 dual-wheel milling & mixing drilling rig,
With its advantage of higher adaptability to strata,
it tackled the "hard bone" of Anji's "Two Mountains" Future Sci-Tech City,
Stable performance, high efficiency,
Frequently praised by the construction party!

Stiffened milling and mixing
Good quality of trench wall shape
High vertical accuracy
Fast construction speed

High construction efficiency
Wide range of applications
High-precision verticality
Low construction disturbance
Less spoil and slurry discharge
Large wall depth


▲ Project site
The project is located in Lingfeng Village, Lingfeng Subdistrict, Anji County, Huzhou City, Zhejiang Province, with a total building area of 51,034.82 square meters, of which the underground building area is 17,353.08 square meters.
In this project, the task of the ZDM55 dual-wheel milling & mixing drilling rig is to construct the underground equal-thickness cement-soil mixing water-stop continuous wall before foundation pit excavation. The total length of the water-stop wall is about 730 m, and the wall thickness is 700 mm. On site, it achieves a stable construction task of 15-17 wall panels per day.

Among them, the difficulty of the project lies in the presence of a lot of gravel in the first 6 meters of the construction stratum, with clay mixed in the gravel layer. It is not only highly cohesive but also high in hardness, making it difficult for ordinary drilling rigs to drill down. The ZDM55 dual-wheel milling & mixing drilling rig produced by our company, by arranging reasonable cutting teeth on two high-torque gearboxes, can easily and effectively cut hard strata, improving cutting capacity and construction efficiency.
In addition, the equipment is equipped with a high-precision verticality sensor. During construction, the verticality of the trench can be dynamically monitored by computer, and the deviation-correction system configured on the dual-wheel milling equipment can be used for timely adjustment to ensure wall accuracy. The amount of cement slurry injected can also be precisely controlled by computer, promoting uniform mixing of cement slurry and soil, with good wall uniformity and high material utilization.



Dual-wheel milling & mixing drilling rig
Construction process
The dual-wheel milling deep mixing continuous wall is composed of a series of primary panel walls and secondary panel walls arranged alternately. The so-called primary panel wall refers to the batch of walls constructed relatively earlier, and the secondary panel wall refers to the batch constructed relatively later.
As shown in the figure below, the series with the initial letter "P" are primary panel walls, and the series with the initial letter "S" are secondary panel walls. After the primary panel walls reach a certain hardness, the secondary panel walls are constructed. This construction method is called the "hard milling method".

Process flow
The milling deep mixing method (CSM method) is an innovative underground continuous wall or seepage-proof wall construction equipment that applies the original hydraulic trench cutter equipment combined with deep mixing technology.
It mainly includes: site clearing and material preparation → surveying and setting out → installation and commissioning → trenching and laying plates → machine moving and positioning → milling, cutting, sinking and mixing, slurry spraying → rotary lifting and slurry spraying → wall completion and machine moving → inserting H-shaped steel piles


Main structure

1. Milling head device
2. Upper clamping and lifting device
3. Lower clamping and pressurizing device
4. Intermediate pulley block
5. Water spraying device
6. Rectangular drill pipe
7. Hydraulic power station
8. Electro-hydraulic control operating system
9. Walking or crawler-type pile frame
10. Backend system
Pile driver parameters

Equipment comparison




Applicable pile types
Water-stop pile
Trench wall reinforcement pile, foundation reinforcement pile
Rectangular secant pile
Foundation improvement
Underground hazardous substance treatment
Special process pile
Applicable strata
Various soil layers, clay layers,
fluid-plastic silt layers, sand layers,
hardened sand layers, quicksand,
gravel layers, weathered rock layers
Applicable pile diameter / hole diameter
2800x700
2800x800
2800x1000
Milling hole depth
10M~55.5M
Note: Different milling cutter wheels are selected according to different conditions such as geology, process, and hole diameter.
Zhushan Lake Tunnel, China's Longest Under-Construction Expressway Lakebed Tunnel, Achieves Full Breakthrough
下一篇Xi'an Xianyang International Airport Phase III Expansion Project: Total area of approximately 700,000 square meters

2026-09-28 1137 0

2026-09-24 10491 0

2026-09-23 10629 0

2026-09-22 10708 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)