Construction Tender Announcement for Section TJ01 of the 320 National Highway Longyou Tongjia to Pingshanqiao Highway Project (Project Name)
I. Industry:Highway
II. Tenderee:Longyou County Transportation Development Co., Ltd.
III. Total Project Investment:Approximately RMB 1,234.19 million
IV. Project Overview:
The project route starts at the southwest side of Tongjia Village, Longyou County, forming an intersection with the terminus of the Huzhen to Tongjia Highway. The route runs from east to west, passing through Jietou Village and Xixu Village, then near Yacun Village a diamond interchange is set to cross over the Li-Ning Expressway connector. The route is laid out along Yacun, Tangwu, and Shaomache; after crossing over the Li-Ning Expressway, it continues along Shupeng Village, Hulingshan, and Xiawengfan, with a bridge set to cross over the Hushi Line, then passes through Shuangzhai to near Xintangdi, where it uses the reserved bridge of the Quzhou-Lishui Railway to pass underneath the Quzhou-Lishui Railway. Thereafter the route runs from north to south through Humen to the north side of Xihoushantou, where it connects with the existing Pintuan Highway, is widened along the Pintuan Highway, and is widened on the right side at the Tuanshi Separated Bridge and Wangchuantou Bridge to cross over the Hangzhou-Jinhua-Quzhou Expressway and the Qujiang Waterway, reaching the terminus near Pingshanqiao Village on the 320 National Highway, where it connects with the Longyou Pingshanqiao to Qujiang Pingtang Section of the 320 National Highway. The total route length is approximately 18.95 km. The entire line includes bridges of approximately 2,197 m in 16 structures (including approximately 1,555 m in 5 major bridges and approximately 642 m in 11 medium and small bridges); one interchange (grade-separated junction) and one at-grade intersection with directional ramps.
V. Planned Construction Period:730 calendar days (24 months)
VI. Obtaining of Tender Documents:
The tender documents and supplementary (Q&A, clarification) and amendment documents for this project will be distributed by online download.
Online download period for tender documents: October 11, 2023 to October 16, 2023.
Prospective bidders may, with their enterprise CA digital certificate, log in to the "Zhejiang Provincial Public Resource Trading Center Electronic Bidding and Tendering Platform" (hereinafter referred to as the "Electronic Trading Platform") (website: http://www.zmctc.com) and download the tender documents and supplementary documents (Q&A, clarification) below this announcement. Bidders participating in multiple sections must download the tender documents for the corresponding sections separately and submit bid documents separately for each section.
Announcement Release Date:October 11, 2023
Deadline for Submission of Documents:November 02, 2023 14:30
Source:Zhejiang Provincial Public Resource Trading Service Platform
Link:
http://www.zmctc.com//zjgcjy/infodetail/?infoid=94babf44-4f05-4f42-95ac-843574890637&categoryNum=004001001
Breaking Through the 'Thousand-Layer Cake'! Latest Progress on Phase II of Shenzhen Metro Line 16
下一篇Breakthrough: Equipping a Pillar of the Nation with a Chinese "Heart" — CRCHI's Independently Developed Main Bearing for the World's Largest-Diameter Shield Tunneling Machine Rolls Off the Production Line in Changsha

2024-10-08 13423 0

2024-09-30 13142 0

2024-09-20 12919 0

2024-09-13 13091 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)