500mm Diameter, 14m Deep: KS800 Supports Micro Piles at Fuzhou Xiangshan Tunnel

2023-09-13 2515 0人评论

Fuzhou City, Fujian Province

Xiangshan Tunnel Widening and Reconstruction Project

500mm Diameter, 14m Deep Micro Piles

Foreword

The Fuzhou Xiangshan Tunnel Widening and Reconstruction Project (Section 1) starts at Meifeng Branch Road Intersection, extends from north to south through Xiangshan Tunnel, Fangqin West Road, and ends at Mengshan Road Intersection, with a total length of approximately 1.18 km. This project is an important node of the West Second Ring traffic artery. The widening and reconstruction improves the traffic node function in the western urban area of Fuzhou, enables fast and orderly conversion of the Second Ring traffic flow, and enhances road traffic safety.

01. Machine Model

Machine Model

Machine Model: Kongshan KS800 Multi-functional Anchor Drilling Rig

02. Construction Site

Construction Site

Construction Location: West Second Ring North Road, Hongshan Town, Gulou District, Fuzhou City, Fujian Province

03. Construction Process

Construction Process

Construction Process: Micro Piles

Diameter: 500mm

Depth: 14m

Drill Bit: 500mm

Impactor: 12-inch

Geology: Backfill + Rock Formation

Drill Pipe Diameter: 114mm

Drill Pipe Length: 2m

Centralizer Length: 3m

Centralizer Diameter: 380mm

Equipped with 2 air compressors:

Elman PDSK1050 Air Compressor: 29.7 m³/min at 24.5 kg

Elman PDSK900S Air Compressor: 25.5 m³/min at 24.6 kg

04. Construction Effect

Construction Effect

Construction Angle: 90°

Construction Efficiency: 10.5 m/h


评论 (0)