Bidding Announcement for Construction Lump-Sum Contracting of the "Four Electric" System Integration Project of the Newly Built Xi'an-Chongqing High-Speed Railway Ankang-Chongqing Section (Within Shaanxi Province)
I. Industry: Railway Electrification
II. Tenderee: Xicheng Railway Passenger Dedicated Line Shaanxi Co., Ltd.
III. Total Project Investment: China State Railway Group 28%, Shaanxi Province 9%, Chongqing Municipality 28%, Sichuan Province 35%
IV. Project Overview:
The newly built Xi'an-Chongqing High-Speed Railway Ankang-Chongqing (within Shaanxi Province) line starts from Ankang West Station of the Xi'an-Ankang High-Speed Railway, crosses the Han River southward, then goes upstream along the Lan River to Langao County; after setting up a station, it goes upstream along the Tao River, passes through the Daba Mountains (tunnel length 14,172 m) and reaches the Shaanxi-Chongqing provincial boundary. Mileage range: DK0+734.55 to DK81+000. The total length of the newly built line is 80.27 km, including 13 bridges with a length of 5.26 km and 14 tunnels with a length of 74.12 km. The total length of bridges and tunnels is 79.38 km, with a bridge-tunnel ratio of 98.9%. There is one station, Langao Station. The design speed is 350 km/h, and the construction period is 6 years.
V. Section Division:
This tender is divided into 1 section in total. Section No.: KYSDJC-1, KYSDJC-1. The work quantity is: "Four Electric" integration construction, including tunnel lighting, communication, signaling and information, disaster monitoring, electric power and electric traction power supply, buildings, other operational production equipment and structures, large temporary facilities and transitional works, etc. Mileage/range: DK0+734.55 to DK97+948 (railway bureau jurisdiction boundary).
VI. Planned Construction Period: 2,129 calendar days
Planned commencement date: 2023-02-01
Planned completion date: 2028-11-30
VII. Obtaining of Bidding Documents:
Bidders are requested to log in to the Beijing Engineering Construction Public Resource Trading Platform (www.bcactc.com) from 09:00 on December 07, 2022 to 09:00 on December 12, 2022 (Beijing time, the same below) to download the electronic bidding documents.
Announcement Release Date: December 7, 2022
Deadline for Submission of Documents: 11:00 on January 16, 2023
Place for Submission of Bidding Documents: Bid Evaluation Area of Beijing Municipal Engineering Construction Contracting and Contracting Trading Center (Address: No. 15 Daotian Nanli, North of Xiying Road Intersection, Changyang Town, Fangshan District, Beijing)
Source: Beijing Municipal Engineering Construction Information Network
Link:
http://www.bcactc.com/home/gcxx/tdzbgg_new_show.aspx?bulletinid=8a80839984d2d3e10184e68dbf2d2167
Bidding Announcement for Unit-Price Contracting of Construction of the "Four Electric" System Integration Project of the Newly Built Xi'an-Yan'an Railway Xi'an-Tongchuan Section
I. Industry: Railway Electrification
II. Tenderee: Xicheng Railway Passenger Dedicated Line Shaanxi Co., Ltd.
III. Total Project Investment: China State Railway Group 42%, Shaanxi Province 58%
IV. Project Overview:
The newly built Xi'an-Yan'an High-Speed Railway leads from Xi'an North Station and Xi'an East Station, passing through Gaoling District and Yanliang District of Xi'an City, Fuping County of Weinan City, Yaozhou District, Wangyi District, Yintai District and Yijun County of Tongchuan City, and Huangling County, Luochuan County, Fu County, Ganquan County and Baota District of Yan'an City, to the existing Yan'an Station of the Baotou-Xi'an Railway. The main line of the project has a total length of 287.10 km and a design speed of 350 km/h. The construction period is 4.5 years. The main line length of the section from Xi'an East Station (exclusive) to Tongchuan Station (inclusive) of the Xi'an-Yan'an High-Speed Railway is 91.162 km. The line passes through Xi'an City, Weinan City and Tongchuan City in sequence. The design speed is 350 km/h. The project capital accounts for 50% of the total investment, funded by China State Railway Group and Shaanxi Province; funds beyond the capital will use domestic bank loans. The project contribution ratio is 42% for China State Railway Group and 58% for Shaanxi Province. The construction period is 3 years.
V. Section Division:
This tender is divided into 1 section in total. Section No.: XYSDJC-1, XYSDJC-1. The work quantity is: "Four Electric" integration and supporting building construction, including tunnel lighting, communication, signaling and information, disaster monitoring, electric power and electric traction power supply, buildings, other operational production equipment and structures, transitional works, compensation for young crops, etc. Mileage/range: DK000+000 to DK088+310.
VI. Planned Construction Period:
1,048 calendar days
Planned commencement date: 2023-02-01
Planned completion date: 2025-12-15
VII. Obtaining of Bidding Documents:
Bidders are requested to log in to the Beijing Engineering Construction Public Resource Trading Platform (www.bcactc.com) from 09:00 on December 07, 2022 to 09:00 on December 12, 2022 (Beijing time, the same below) to download the electronic bidding documents.
Announcement Release Date: December 7, 2022
Deadline for Submission of Documents: 11:00 on January 16, 2023
Place for Submission of Bidding Documents: Bid Evaluation Area of Beijing Municipal Engineering Construction Contracting and Contracting Trading Center (Address: No. 15 Daotian Nanli, North of Xiying Road Intersection, Changyang Town, Fangshan District, Beijing)
Source: Beijing Municipal Engineering Construction Information Network
Link:
http://www.bcactc.com/home/gcxx/tdzbgg_new_show.aspx?bulletinid=8a80839984d2d3e10184e6abfc6e2270
Prequalification Announcement for Liaocheng Outer Ring Road PPP Project
I. Industry: Highway
II. Tenderee: Liaocheng Highway Development Center
III. Total Project Investment: RMB 2,923.0757 million
IV. Project Overview:
The project construction starts at the intersection of G309 Qinglan Line and S242 Linshang Line in the northeast of Boping Town, Chiping County. It turns northwest west of Doutang Village, goes west south of Guozhuang Village, passes through the south of Dasang Village and Yangguantun Village, intersects at grade with G240 Baotai Line north of Xiaozhai Village, crosses the South-to-North Water Diversion Main Canal west of Huiminli Village, crosses the old course of the Beijing-Hangzhou Grand Canal southeast of Wangtun Village, continues west and intersects at grade with S246 Linzou Line north of Liangshui Town, passes under the Beijing-Kowloon Railway west of Fangtun Village, passes under the Dezhou-Shanghai Expressway east of Qiuzhuang Village along the Majia River, continues southwest along the Majia River, crosses the Weishan Third Main Canal south of Wangpu Village, turns south and follows the west embankment of the existing Weishan Third Main Canal, passes under the Handan-Jinan Railway southeast of Sanlizhuang Village, and finally ends at the at-grade intersection with the existing G309 Qinglan Line east of Tangyi Town, Dongchangfu District.
Construction content and scale: The project route construction mileage is 37.397 km in total, with asphalt concrete pavement, constructed to the technical standard of a two-way four-lane Class I highway, design speed 80 km/h, subgrade width 25.5 m and 31.5 m. The whole line includes 1,139 m/2 large bridges, 213.58 m/4 medium bridges, 19.04 m/1 small bridge, and 107 culverts; 3 separated grade interchanges and 28 at-grade intersections; and 1 new maintenance work area.
V. Obtaining of Bidding Documents:
Time: 09:00 on December 8, 2022 to 17:00 on December 14, 2022 (Beijing time, excluding statutory holidays)
Place: Download from the electronic system of Liaocheng Public Resource Trading Center (http://ggzyjy.liaocheng.gov.cn/lcweb/).
Announcement Release Date: December 7, 2022
Deadline for Submission of Documents: 09:00 on December 29, 2022
Place for Submission of Bidding Documents: Bid Opening Room 1, Third Floor, Liaocheng Public Resource Trading Center (Address: No. 153 Changrun South Road, Liaocheng City)
Source: Liaocheng Public Resource Trading Center
Link:
http://ggzyjy.liaocheng.gov.cn/lcggzy/trade_detailmsg.html?infoid=1f6e6f7a-5e45-43c6-9962-ec949338bc26&releationguid=e218f31f-5926-4d0c-b519-1e9efb9884a9&categorynum=003002001001
CRCC Heavy Industry's "Yuecheng Liangshan" TBM Helps Break Through the Daliangshan No. 1 Tunnel on the Lexi Expressway
下一篇Building Our Home with Our Own Hands! "XCMG Gold" Fleet Joins Forces to Build a World-Class New Base for Foundation Engineering Machinery

2024-10-08 13423 0

2024-09-30 13142 0

2024-09-20 12919 0

2024-09-13 13091 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)