Zoomlion's "Little Green Army" Powers Construction of Hunan's Largest Single River-Crossing Bridge

2022-12-01 1287 0人评论

At the construction site of the Xinglian Road river-crossing passage in the north of Changsha, Zoomlion pump trucks, mixer trucks, tower cranes, crawler cranes, rotary drilling rigs and other equipment are racing against time to meet deadlines and accelerate progress. The project, 5.475 kilometers long, is Hunan's largest single river-crossing bridge and currently Changsha's widest bridge deck, largest single span and longest river-crossing bridge. Designed with eight lanes in both directions, it is expected to be completed and put into use in 2024, which will effectively ease traffic pressure across the river and become one of the important passages for cities such as Yiyang, Changde and Zhangjiajie to enter Changsha.

▲Zoomlion equipment under construction

Several Zoomlion ZR280C-2 rotary drilling rigs are assisting construction on site, with pile diameters of 800-1500 mm and depths of 32 meters, involving drilling into rock, with some pile holes penetrating 3-4 meters into rock at a hardness of about 40 MPa. They use pick-tooth sand-grabbing buckets. Almost all construction on the entire bridge is carried out with Zoomlion equipment, and most customers come from alliance customer equipment leasing. Since construction began last September, the equipment has been consistently well received: "Zoomlion rotary drilling rigs have always been steady, fast at drilling soil, and low in fuel consumption!"

▲Zoomlion Model 280 rotary drilling rig operating on site

According to the customer, the Zoomlion ZR280C-2 rotary drilling rig is easy to operate, stable and reliable, and offers high safety performance. Zoomlion service engineers are also on site throughout the process, providing equipment inspection and other services. They are professional, timely and proactive, safeguarding Zoomlion equipment and always available when needed, which gives great peace of mind!

▲Zoomlion ZR280C-2 rotary drilling rig operating on site

It is understood that in addition to the Xinglian Road river-crossing passage, Zoomlion's "Little Green Army" is also active at major infrastructure project sites on both banks of the river in Changsha, such as the Xiangluzhou Bridge, the Xiangya Road river-crossing passage and the Muping Xiangjiang Grand Bridge.

In the future, Zoomlion will continue to join forces with its customers to boost the speed and efficiency of major projects with high-quality products, providing strong support for high-quality development across various regions.

评论 (0)

TOP