
SANY
Entering the Era of Intelligent Drilling
SANY SD500A Horizontal Directional Drill
↓
Beijing SANY Intelligent Manufacturing Technology Co., Ltd. has developed
a new generation SD500A horizontal directional drill
Building on industry-leading structure and functionality, the SD500A integrates epoch-making intelligent drilling technology and an all-new electronically controlled manipulator, bringing together the best of smart technology. From manufacturing philosophy and advanced technology to customer experience, it consistently upholds the principle of market-driven technology development. With greater emphasis on customers' construction needs and operating habits, the system is more efficient, environmentally friendly, comfortable and safe. Addressing industry pain points, the SD500A horizontal directional drill adopts multiple intelligent designs, introduces a disruptive operating experience, and offers extremely high cost-effectiveness.
Intelligent Drilling Control System

The SD500A horizontal directional drill adopts SANY's independently developed intelligent drilling control system, which has undergone rigorous testing and verification from development to application and can effectively improve construction efficiency.
The intelligent drilling system consists of four sub-modules:
Intelligent drilling/back reaming module
Load-sensing adaptive module
High-efficiency construction module
Easy Maintenance APP communication module
All-new Electronically Controlled Manipulator

Compared with other products of the same type, it offers advantages of faster construction speed and accurate positioning.
With SANY's advanced manufacturing processes and strict quality control management, the SD500A horizontal directional drill equipped with the intelligent drilling system is bound to open a new era for horizontal directional drill products.
Exports Up 96% Year-on-Year! Sunward Continues to Expand into International Markets
下一篇Guiding the Future, Achieving Dreams — SANY SD500A Horizontal Directional Drilling Rig

2026-09-28 1137 0

2026-09-24 10491 0

2026-09-23 10629 0

2026-09-22 10708 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)