Wuhan Hub Through Line Baishazhou Road-Rail Dual-Purpose Yangtze River Bridge to Start Construction in Advance: First Public Disclosure of Environmental Impact Assessment

2021-11-18 1332 0人评论

In accordance with the Environmental Protection Law of the People's Republic of China and the Environmental Impact Assessment Law of the People's Republic of China, Yangtze River Coastal Railway Group Co., Ltd. has commissioned China Railway Siyuan Survey and Design Group Co., Ltd. to take charge of preparing the Environmental Impact Report for the main bridge project of the Baishazhou Road-Rail Dual-Purpose Yangtze River Bridge on the Wuhan Hub Through Line. In accordance with the requirements of the Measures for Public Participation in Environmental Impact Assessment, the relevant information on the assessment work for this project is hereby disclosed to solicit public opinions on the project's environmental impact assessment:

I. Basic Information on the Project Name, Site and Route Selection, and Construction Content

Project name: Main Bridge Project of the Baishazhou Road-Rail Dual-Purpose Yangtze River Bridge on the Wuhan Hub Through Line

Site and route selection: This project is a river-crossing bridge included in the national Layout Plan for Yangtze River Mainline Crossing Channels (2020-2035) and is also a controlling project of the Wuhan Hub Through Line. In accordance with the requirements of the National Development and Reform Commission's Notice on Further Accelerating the Preliminary Work of the High-Speed Railway Along the Yangtze River, the Baishazhou Road-Rail Dual-Purpose Yangtze River Bridge is proposed to be the advance-start section of the Wuhan Hub Through Line. The project crosses the Yangtze River natural barrier on the upstream side of the existing Baishazhou Highway Yangtze River Bridge, passing through the Wuhan Economic and Technological Development Zone and Hongshan District of Wuhan City, Hubei Province.

Construction content: This project is a combined road-rail bridge with the highway on the upper deck and the railway on the lower deck. The railway carries four high-speed rail tracks, and the highway carries a six-lane urban road, with a total length of approximately 2.643 km. The design speed of the upper-deck highway bridge is 80 km/h; the lower-deck railway bridge operates EMU trains at a design speed of 250 km/h.

The design scheme on which the final environmental impact assessment is based shall be subject to the disclosure of the draft environmental impact report submitted for approval.

II. Name and Contact Information of the Construction Unit

Name of construction unit: Yangtze River Coastal Railway Group Co., Ltd. Contact person: Mr. Wei Tel: 027-51129436 Email: 57679006@qq.com Address: Building 7, Lanqiao Mansion, No. 308 Youyi Avenue, Wuchang District, Wuhan City, Hubei Province (Postal code: 430062) III. Name of the Environmental Impact Report Preparation Unit Lead preparation unit for the environmental impact assessment: China Railway Siyuan Survey and Design Group Co., Ltd. Address: No. 745 Heping Avenue, Wuchang District, Wuhan City, Hubei Province (Postal code: 430063) Contact person: Mr. Yue Tel: 027-51184132 Email address: gzcy_tsy@126.com

IV. Online Link to the Public Opinion Form

During the preparation of the draft environmental impact report for the construction project, the public may download the Public Opinion Form for Environmental Impact Assessment formulated by the Ministry of Ecology and Environment (download link: https://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/W020181024369122449069.docx) and fill in opinions related to the environmental impact assessment during the construction and operation of the project.

V. Methods and Channels for Submitting the Public Opinion Form

After the relevant information is disclosed, the public may express oral opinions or submit written opinions to the construction unit or the environmental impact assessment unit by telephone, letter, email, or other convenient means, and may also make further inquiries about unclear or unknown aspects of the project.

The public is requested to provide accurate personal information during the survey process, including name, occupation, education level, home or work address, and contact telephone number, so that information can be fed back as needed.

During the preparation of the draft environmental impact report, the public may submit opinions related to the environmental impact assessment to the construction unit at any time.

Disclosure issuing unit: Yangtze River Coastal Railway Group Co., Ltd.

November 16, 2021


评论 (0)

TOP