Underground Space of the Plot Must Connect with Guangzhou Metro Line 7

2018-01-10 815 0人评论
  On January 4, the reporter learned from the Shunde District Public Trading Center that the plot on the south side of Meidi Avenue and the west side of Yifeng Road in Beijiao New Town will be auctioned on-site on January 12. The government requires that no less than 60,000 square meters of commercial property be developed on this 67,369.9-square-meter plot, and the commercial property in the plot's underground space must connect with the concourse level of Meidi Avenue Station on Guangzhou Metro Line 7.

  It is understood that the plot is located on the south side of Meidi Avenue and the west side of Yifeng Road in Beijiao New Town, with a land area of 67,369.9 square meters. Among them, the land area of Zone A is 58,968.77 square meters, and the land use is for wholesale and retail, accommodation and catering, business and finance, press and publication, and cultural and sports entertainment, compatible with urban residential use. The floor area ratio is higher than 1.0 and not higher than 5.0, the building density is not higher than 40%, and the green space ratio is not lower than 35%. The land area of Zone B is 8,401.13 square meters, and the land use is for parks and green spaces. The plot will be listed on-site on January 12 under the method of "capped land price, competitive bidding for supporting construction." The starting price for bidding is RMB 1,974.54 million, and each bid increment shall not be less than RMB 20 million. When bidding upward for the area of commodity housing to be returned to the government free of charge as supporting construction, the increment shall be in steps of 300 square meters.

  It is worth noting that the government requires the winning bidder to construct and return to the government free of charge 30,000 square meters (floor area ratio basis) of apartment-style hotel and corresponding supporting parking spaces and other supporting facilities according to the planning conditions. Of the commercial land to be developed and constructed, no less than 60,000 square meters and no more than 80,000 square meters (both referring to floor area ratio basis) must be used for shopping malls and catering facilities, and the winning bidder must self-hold no less than 80% of the floor area ratio basis of the shopping mall and catering facilities, with the self-holding period consistent with the land use right transfer term. In addition, the west extension section in Shunde of Phase I of Guangzhou Metro Line 7 is planned for construction on the east side of the plot, and the commercial property in the plot's underground space must connect with the concourse level of Meidi Avenue Station on Guangzhou Metro Line 7.

评论 (0)

TOP