Spiral Drilling Rig Manufacturer Spiral Drilling Rig Price Spiral Drilling Rig Models Spiral Drilling Rig Parameters Spiral Drilling Rig Pictures Spiral Drilling Rig Factory Supply
I. Main Features of the Spiral Pile Driver:
Fast piling speed: an average of 3 minutes to drive a pile 6 meters deep, meaning one hole can be drilled in 3 minutes. Fuel-efficient, using about half the fuel of an ordinary pile driver, saving you the cost of one pile driver in a single year. The drill bit is made of manganese steel and specially processed, suitable for various geological environments. Crawler or wheeled travel offers strong mobility and climbing ability. The frame can move forward and backward, and the drill bit can be adjusted left and right for accurate piling positioning.
II. Main Parameters of the Spiral Pile Driver:
|
Rated Power (KW) |
55 |
|
Rated Speed (r/min) |
2400 |
|
Starting Voltage (V) |
24 |
|
Overall Dimensions (L*W*H) mm |
4370*2010*4290 |
|
Minimum Ground Clearance (mm) |
380 |
|
Track Shoe Width (mm) |
260 |
|
Mast Height (mm) |
4370 |
|
Drilling Diameter (mm) |
130--800 |
|
Maximum Drilling Depth (mm) |
3600 |
|
Drill Pipe Speed (r/min) |
71 |
|
Main Pump Model |
CBG1-F032/032 |
|
Main Pump Speed (L/min) |
2000-2400 |
|
Main Pump Pressure (Mpa) |
20 |
|
Main Valve Flow (L/min) |
100 |
|
Hydraulic Oil Tank Capacity (L) |
200 |
|
Gradeability (°) |
35 |
|
Maximum Travel Speed (KW/h) |
5 |
III. Contact Information for the Spiral Pile Driver:
Contact Person: Wang Li
WeChat: 13287223671
Tel: 0537-2670858 Mobile: 13287223671
Q Q: 2881248854
Factory Direct Supply of Telescopic Kelly Auger Drills: Pricing
下一篇Wheeled Spiral Pile Driver Directly Supplied by Manufacturer

2025-10-11 12785 0

2025-10-11 12334 0

2025-10-11 12498 0

2025-09-11 12042 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)