Precautions During Pile Driving Construction

2016-06-06 725 0人评论
a. Long interruptions should be avoided during pile driving.
b. For the construction of extra-long steel piles, heavy hammers should be used, and the hammering stress must be strictly controlled.
c. For large-diameter steel piles, if it is difficult to drive them to the bearing stratum, the pile toe can be reinforced or other comprehensive construction methods can be adopted.

评论 (0)

TOP