On September 17, Wolwa Group loaded 2 DLS890-9A new wheeled excavators/sugarcane wood handlers and 4 DLS880-9A wheeled excavators/sugarcane wood handlers in the rain for shipment to Qingdao Port. Earlier, the Indian customer conducted a two-day inspection visit to Wolwa Group and spoke highly of the group's technical strength, production capacity, product quality, product certifications, shipping capability, and after-sales service, and signed a long-term cooperation agreement.
In recent years, Wolwa Group has consistently adhered to a technology-leading strategy, carried out technical cooperation with well-known R&D institutions around the world, and, in response to the needs of customers in different countries and regions, comprehensively upgraded and updated its existing products. Its technology has always kept pace with international standards, continuously enhancing the international competitive advantages of its products. While making every effort to improve product quality, Wolwa Group has repeatedly studied the Indian market and, in response to India's typical tropical monsoon climate, made relevant technical improvements to the excavators' heat dissipation performance, fuel consumption, handling, and comfort, and strengthened its marketing service capabilities.
The models exported this time are the DLS890-9A new wheeled excavator/sugarcane wood handler and the DLS880-9A wheeled excavator/sugarcane wood handler.

Wolwa Group successfully exports 6 excavators to India

Wolwa Group successfully exports 6 excavators to India

Wolwa Group successfully exports 6 excavators to India

Wolwa Group successfully exports 6 excavators to India
Jiangxi Coalfield Geology Bureau Achieves Steady Economic Growth
下一篇80 Zoomlion Excavators Break Ground in Iran, Becoming the Local Top Choice

2026-09-28 1137 0

2026-09-24 10491 0

2026-09-23 10629 0

2026-09-22 10708 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)