Points to Note When Lubricating Small Rotary Drilling Rigs

We all know that regular equipment maintenance is very important, including inspection and repair of components, injection and replacement of various oils, and cleaning. Today, the editor will explain some details to note when lubricating rotary drilling rigs. The main purpose of injecting grease into rotary drilling rigs is to reduce wear on bearings and bushings. Below we will introduce some specific precautions.

 When we add grease, rotary drilling rigs have many lubrication points and some are located high up. At this time, we need to use some tools. Manual grease guns are convenient and flexible, so for convenience we still need to equip manual grease guns for lubrication. Most problems that occur when injecting grease are caused by improper grease management and improper use of grease guns. When selecting grease, pay attention: we generally buy grease in buckets, and one bucket lasts a long time, which may cause the grease to be contaminated and clog the grease gun. It is recommended to use bagged or bottled grease to effectively prevent contamination. Most cases of the grease gun not dispensing grease are due to air inside the grease gun. When grease injection at various positions on the main machine is blocked, you can remove the female coupler at the front end of the grease gun hose and the male coupler on the main machine, then tighten the two threads and force grease injection.

Today we have explained some knowledge about lubrication of small rotary drilling rigs. In daily use of rotary drilling rigs, we must pay attention to checking the lubrication level, regularly add grease, and also prevent grease contamination.







Method for Reinstalling the Track of a Rotary Drilling Rig

Method for reinstalling the track of a rotary drilling rig. Regarding the method of reinstalling a derailed track, I think there is no fixed standard. First, the track pin should be removed, the grease released, and the track loosened. Then, depending on the situation, use the excavator bucket and travel to assist in reinstalling the track. The easier a track is to derail, the easier it is to reinstall.

If the track has slipped inward off the track, the bucket cannot reach the track. In this case, a wire rope is needed to pull part of the track onto the idler wheel or drive sprocket, and then rotate the travel drive sprocket. Just note that the excess slack in the track should be mostly at the installation point, making it easier to install. Once the idler wheel and drive sprocket positions are installed, most of the track is basically installed. The track roller position can be installed by lifting the track and idling it. The carrier roller part can be installed directly with the bucket. If the bucket cannot reach, another method is to first lift the track, find a suitable wooden stick, support it between the track at the carrier roller position and the ground, then slowly lower the track. The track at the carrier roller position will be lifted by the wooden stick, thereby reinstalling the derailed track.



Many people still have doubts about the economic efficiency of small rotary drilling rigs, worrying that after paying a high price they cannot get enough return in a short time. Today the editor will answer everyone, using the Bauer rotary drilling rig construction price, to eliminate your doubts.

 In fact, by analyzing and judging the rotary drilling rig market, it is not difficult to see that the demand for small rotary drilling rigs is very large, which also reflects from the side that its economic efficiency is quite high; otherwise, it would not become a trend. In addition, the production and manufacturing technology of rotary drilling rigs is gradually maturing. Many small rotary drilling rigs can complete the work of medium and large such rigs, and large rigs may even be less efficient and economical than small rigs.

When it comes to the efficiency of rotary drilling rigs, it generally includes two aspects: work efficiency and economic efficiency. However, its economic efficiency is determined by work efficiency.