Introduction to issues needing attention in the dismantling of ringlock scaffolding

1. Weather: Dismantling work is strictly prohibited in fog, strong wind, rain, snow, lightning, and other weather conditions. Dismantling work shall not be carried out at night. 2. Coordination: When disconnecting the joints, relevant personnel must be notified in advance to prevent falls. 3. Sequence: The dismantling sequence is the reverse of the erection sequence. First dismantle the components installed last, and so on; the components erected first are dismantled last. 4. Safety: (1) During dismantling work, warning signs and perimeter fences must be set up, and unauthorized personnel are strictly prohibited from entering. (2) Personnel working at heights must strictly use a full set of safety equipment. 5. Placement: Dismantled components must not be thrown; they should be stacked neatly when placed. 6. Before dismantling work, unified planning must be carried out. Next, Yanxin Metal editor will introduce issues needing attention in storage.






Only by breaking the old order can we provide soil for innovation.

Only by breaking the old order can we provide soil for innovation.

Because, if rented by the ton, Heilongjiang ringlock scaffolding, the rental company will not make efforts to reduce wall thickness, because reducing wall thickness will reduce revenue.

In this way, to a certain extent, it can ensure that the wall thickness of ringlock scaffolding will not become thinner and thinner.

The difficult current situation of the scaffolding rental industry

The traditional rental model of the scaffolding industry is that construction companies rent scaffolding, use, manage, and maintain it themselves, and return it to the rental company after use.

The rental company saves worry, and as long as it is rented out, it is basically net profit, because loss and damage are compensated. There are even many people who became rich relying on this loss compensation.

However, the good days will eventually pass. Nowadays, the total volume of the construction market is decreasing, and new building materials are continuously being put on the market. Demand is decreasing and supply is increasing, bringing unprecedented challenges to traditional rental enterprises.

Due to fierce market competition, traditional scaffolding rental prices and services are as low as unimaginable before: no responsibility for transportation, no responsibility for loss, no responsibility for damage; they are only responsible for use, and the rental fee must be paid off over several years.

How to change the current situation? And at the same time benefit the construction unit?

In the past, scaffolding construction was completed jointly by the general contractor and the labor company. First, communication costs were high; second, it was difficult to manage and coordinate. Loss and damage were serious, the general contractor spent effort and energy, and cost, schedule, and quality were uncontrollable.


Design the support according to the load on the frame during construction, optimize the spacing of vertical poles, and, under the condition that the force calculation is qualified, adjust the spacing to 1.5m×1.5m or 1.5m×0.9m, with a step distance of 1.5m, and appropriately densify local positions, which is convenient for workers to operate and improves construction speed;

In areas where terrain conditions vary greatly, set steps of 0.5m or 1m according to site elevation conditions to reduce excavation and fill volume;

At curved positions, ringlock scaffolding can use steel pipe ties at corners; compared with the principle of vertical arrangement with vertical poles, the construction cost is lower;

The ringlock scaffolding operating platform is made cantilevered, reducing construction land use and support erection workload, and saving construction costs;

For door opening design, priority should be given to using unit trusses as door opening columns for ease of construction; if force conditions do not permit, materials such as section steel and thick steel pipes can also be used as door opening columns;

In addition to meeting force requirements, the selection of top jacks should also be combined with the actual size of the main keel to avoid situations where the main keel cannot be placed, which would make the scheme infeasible;

When analyzing the force on the keel, calculation should be carried out in combination with the actual size of the keel in the local material market, and the correct calculation formula should be selected according to the actual material conditions to ensure the scheme is feasible. National standards should be strictly implemented during construction.