Slope Treatment Project for the Colorful Yunnan New Sun International Elderly Care and Health Industry Zone of the Gudian Project

The project is located within the Gudian Famous City Wetland Park, with a treatment length of approximately 80 m and a slope height of approximately 60 m. The main treatment type is frame lattice beams + anchor cables.

Slope Treatment Project of Baotou Steel Baiyun Iron Mine

The project is located in the main ore zone and east mining zone of the Bayan Obo Iron Mine in Baotou City. Zone E of the main ore zone is reinforced with ribbed slab prestressed anchor cable retaining walls, with a contract value of 8 million yuan.

Slope Support for the Living Area of Unit 61606

The hillside height is 6 m to 15 m, and a permanent slope protection structure of lattice beams plus anchor bolts is adopted.

Geological Disaster Treatment of Kangjiaya, Nanshan, Wen County

       The project treatment includes five items: slope cutting and weight reduction, systematic anchor bolt anchoring and prestressed anchoring, masonry strip slope protection and biological slope surface protection, gravity-type toe retaining, built-in drainage at edges and platforms, slope surface protection, and greening.

Stability and Safety Assessment of the Phase II Dam of a Solid Waste Sanitary Disposal Site in Southwest China

  The company undertook the dam safety and stability assessment work. It mainly carried out calculation and analysis of anti-sliding stability and dam foundation stress under various working conditions, and put forward relevant recommendations.

Geological Disaster Prevention and Control Project for the Section from Miaotang Town, Zheng'an County to Huangyang Town, Suiyang County on Line S303, Zunyi City, Guizhou Province

The landslide was active before treatment and was treated with anti-slide piles. The anti-slide pile section is 2 m × 3 m, with a maximum pile length of 26 m. Hand-dug piles were used, and manual blasting was adopted for the bedrock portion.

Slope Treatment Project for the Combined High- and Low-Pressure Pumping Stations and Water Pool Edge of the First-Class Road on Changyao Mountain of the Gudian Project

The project is located within the villa area of Gudian Famous City, with a treatment length of approximately 144 m and a maximum slope height of approximately 20 m. The main treatment type is frame lattice beams + anchor cables + inclined retaining walls.