The project is located within the Gudian Famous City Wetland Park, with a treatment length of approximately 80 m and a slope height of approximately 60 m. The main treatment type is frame lattice beams + anchor cables.

The project is located in the main ore zone and east mining zone of the Bayan Obo Iron Mine in Baotou City. Zone E of the main ore zone is reinforced with ribbed slab prestressed anchor cable retaining walls, with a contract value of 8 million yuan.
The hillside height is 6 m to 15 m, and a permanent slope protection structure of lattice beams plus anchor bolts is adopted.

The project treatment includes five items: slope cutting and weight reduction, systematic anchor bolt anchoring and prestressed anchoring, masonry strip slope protection and biological slope surface protection, gravity-type toe retaining, built-in drainage at edges and platforms, slope surface protection, and greening.
The company undertook the dam safety and stability assessment work. It mainly carried out calculation and analysis of anti-sliding stability and dam foundation stress under various working conditions, and put forward relevant recommendations.
The landslide was active before treatment and was treated with anti-slide piles. The anti-slide pile section is 2 m × 3 m, with a maximum pile length of 26 m. Hand-dug piles were used, and manual blasting was adopted for the bedrock portion.
The project is located within the villa area of Gudian Famous City, with a treatment length of approximately 144 m and a maximum slope height of approximately 20 m. The main treatment type is frame lattice beams + anchor cables + inclined retaining walls.