Ground/Subgrade Treatment

First-class qualification in ground and foundation engineering. Quality forged by professionalism, brilliance achieved through perseverance. Becoming a leader in the application and development of geotechnical engineering technology.
¥1.00
商户:基础工程装备已售 0库存 0单位:item

商品详情

Rongxin Building, Nan'an, Fujian

31-story frame-shear wall structure, building area of approximately 25,000 m²

Treatment area of approximately 3,000 m²

Treatment method: static-pressure vibratory CFG piles combined with jet grouting piles

Technical innovation: CFG piles used to treat liquefiable silty sand layers



Longyan Transportation Highway Management Center, Fujian

24 stories in total, with a two-level basement

 Building area of approximately 45,000 m²

 Treatment method: PHC pile composite foundation

 Technical innovation: PHC pile ground treatment in karst areas



Donghu Garden, Longyan, Fujian

2 high-rise 27-story frame-shear wall residential buildings

Building area of approximately 30,000 m²

Treatment method: large-diameter CFG pile composite foundation

Technical innovation: large-diameter CFG piles (bored by impact drilling, Φ800)



Zijin Copper 200,000-ton Copper Smelting Project

Single-story industrial plant, covering an area of approximately 700,000 m²

 Treatment method: dynamic compaction ground treatment

 Technical innovation: stone columns + dynamic compaction treatment

Main Hall of Longyan Sports Park, Fujian

Building area of approximately 30,000 m², seating capacity of 3,000

 Treatment area of approximately 9,000 m²

 Treatment method: static-pressure vibratory driven-tube CFG piles combined with jet grouting piles

Shuangyong Expressway Sections A12 and A13

Yongchun–Yongding Expressway

 Treatment method: stone columns / sand piles / grouting of karst caves